Use the same saved storyboard for a focused review of sequence, visuals, and pacing. Reviewers need space membership and access to the document's area. The author and space owner can edit the canvas; other members can review within their available permissions.
Give Reviewers Enough Context
•Save the latest work - Finish the current edit and confirm that no changes are still pending.
•Share the document link - Choose reviewers who can open the space and any private area containing the storyboard. Sending the URL does not grant that access.
•Point to the brief - Open Article beside the canvas when the linked article contains the script, purpose, or acceptance criteria. Tell reviewers which scene or question needs attention first.
Walk Through The Story
•Use the scene tree - Follow its board order rather than guessing the sequence from card positions on the canvas.
•Examine one moment at a time - Read its action and dialogue, look at the cover, and compare its duration with the intended pacing. Use Inspector to inspect the text when a cover fills the card.
•Record specific feedback - Open Comments and name the scene and board in your message. The thread belongs to the whole document, so selecting a board does not automatically attach the comment to it.
•Make agreed changes - An editor can update the board and choose Draft, Review, or Approved to reflect the team's decision.
Participant pointers can help you see what someone is examining. Each person retains their own canvas view, so name the scene or board when you want everyone to look at the same moment.
Leave A Clear Result
•Check the complete sequence - Look for a missing transition, unexplained action, or timing that no longer fits after the changes.
•Summarize outstanding decisions - Use a short comment or canvas Todo list so unfinished work does not depend on remembering the meeting.
•Confirm the save state - The editor should verify that the final changes are saved before ending the session.
Approved is a planning label, not a locked revision or separate approval record. If the work changes later, review the affected boards again and update their status as appropriate.
For editing rights, personal undo, and recovery, read Saving and review.